ceiling keel -30-10

www.4858.com:美高梅手机版登录4858 > 产品展示 > Ceiling keel > ceiling keel -30-10

ceiling keel -30-10

所属分类:Ceiling keel

详细信息

[] profile ceiling keel:
Ceiling keel is a kind of new building materials, along with the development of modernization construction of our country, in recent years has been widely used in hotels, passenger station, station, theater, shopping malls, factories, buildings, old building renovation, interior decoration set, ceiling and other places. Light steel keel has the advantages of light weight, high strength, waterproof, shockproof, dustproof, adaptation, sound insulation, sound-absorbing, temperature and other functions, also has the advantages of simple construction period is short, etc., are widely used for this purpose by users and design units.

Ceiling keel products exhibition: 

ceiling keel -30-10
 

Ceiling keel operating conditions:
1 construction, should be in the cast-in-place concrete floor slab or precast concrete floor, according to the design requirements according to the pre buried between, Phi 6~ Phi 10 reinforced concrete boom, if there is no design requirements according to the arrangement position of pre high keel buried steel suspender, general spacing why 900~1200mm.
2 when the ceiling room walls and columns in brick masonry, should be in the elevation along the wall and ceiling around the column, masonry embedded anticorrosive wood block, along the wall spacing 900~1200mm, each side shall be buried column did not shoot brick more than two blocks.
3 after the installation of all kinds of pipeline ventilation and ceiling, determine the lamp position, vents and various open hole position.
4 all the matching various materials prepared.
5 ceiling cover panels before installation should finish wall, wet operation project.
6 pitched roof construction operating platform shelf.
The 7 suspended ceiling keel frame roof in a large area before construction, should do the model, on the roof of the arch, a light slot, processing structure of vent, block and fixed methods shall be approved by the test equipment and the approval rear can construction of large area.